PHASEZERO

Search
  • Lisa Gentile

Role and Responsabilities in a Project

Architect/Designer

___________

Coordinate all the parties involved in the project, as well as design it. Collaborate with the urban planner for a successful planning


application. Research, invent and draw the construction drawings. Collaborate with the engineer to match the ideal layout with the structural needs. Collaborate with the interior designer to check the feasibility of the proposal and supervise the design. Make and manage the tender. Collaborate with the project manager and the contractor to prepare programme and schedules related with the building work.


Supervise the construction and authorize payments. Check that all details are according with drawing and the client expectation and update the client on the weekly result.


Interior Designer

__________

Design the interiors, chose the better materials and creative solution to make the client feeling better when he/she is at home. Study the habits, psychology and morphology of the client to make everything bespoke on his/her size and needs. Deal with manufacturers to create each piece ad hoc. Select the material to be used. Manage and supervise the production and installation.


Structural Engineer

__________

Design the structure, find creative solution to make the building stand against weather and time. Collaborate with the team to better accommodate the structure with the client needs. Supervise the construction to check material and details are made according with drawings and BS standards.


Urban Planner

__________

Study and research the planning policies of your area and make the strategy to success in the planning application process. Prepare the documents and follow up the process with the council.


BIM Consultant

__________

Create and manage the model that include the information from all the professional involved and overlap it to check that there are not incompatible information. Create all the schedules and extrapolate the drawings so all the parties involved can have a full understand of the project and discuss details having the knowledge of the complete scheme.


Project Manager

__________

Manage the construction. Helps the contractor to communicate with the architect and the client. Solve problems on site and overlook that all the tasks are completed on time. Reports to the contract administrator all the variation and problem arised. Coordinate the teams on site.


Party Wall surveyor

__________

Deals with your issue with neighbours before and during construction. Prepare and negotiate for you the party wall agreement with your neighbour`s surveyor and resolve for you any dispute arise.


Contractor/Builder

__________

Build it! Overlap all the information coming from the professionals involved and make your dream true. Coordinate subcontractor and installer and supervise all the operation in and around the building. Release the certificates and warranties, as well as the O&M manual.




3 views0 comments

Recent Posts

See All